钢筋工程量计算书工程名称:厂房算量钢筋简图7.bmp9.bmp11.bmp16.bmp18.bmp20.bmp钢筋工程量计算书厂房算量计算表达式件5317.525476.2755405.715168.21553.26549.915271.3851199.505重量kg构件名称:KZ7构件位置:[7,C]、[8,C]、[4,B]、[7,B]、[8,B]柱(KZ7)纵筋:4B25/6B25/6B22本标准层有:1个自然层。标高为:20.65米至25.15米(4B25)长=4.5[柱高]-0.65[非搭区]-0.03+12*0.025=4.12(4B25)重=4*4.12*3.853375[钢筋比重]=63.504(5层:中柱柱顶弯锚12d)(6B25)长=4.5[柱高]-0.65[非搭区]-0.03+12*0.025=4.12(6B25)重=6*4.12*3.853375[钢筋比重]=95.255(5层:中柱柱顶弯锚12d)(6B22)长=4.5[柱高]-0.65[非搭区]+31*0.022[直锚长]=4.532(6B22)重=6*4.532*2.984054[钢筋比重]=81.142(5层:中柱柱顶直锚)箍筋(A8@100/200)的计算:加密区箍数n1=(0.65[底加密]+0.65[顶加密]+0.8[梁高])/0.1[间距]+2=23(四舍五入)非加密区箍数=(4.5[柱高]-(23-1)*0.1[加密长])/0.2[间距]-1=11(四舍五入)箍筋(A8@100/200)长=(540+590+540+590+4*2*8+2*11.9*8)/1000=2.5144箍筋(A8@100/200)重=34*2.514*0.3935856[钢筋比重]=33.642拉筋(A8@100/200)长=(590+2*8+2*11.9*8)/1000=0.7964拉筋(A8@100/200)重=34*0.796*0.3935856[钢筋比重]=10.652拉筋(A8@100/200)长=(540+2*8+2*11.9*8)/1000=0.7464拉筋(A8@100/200)重=34*0.746*0.3935856[钢筋比重]=9.983电渣压力焊(直径25)50(个)电渣压力焊(直径22)30(个)柱圆钢筋d<=10---合计柱螺纹钢d>20---合计