钢筋工程量计算书工程名称:厂房算量钢筋简图7.bmp9.bmp11.bmp13.bmp18.bmp20.bmp22.bmp钢筋工程量计算书厂房算量计算表达式件524.215543.065268.5655539.355171.025230.8155211.405613.24582.41292.78重量kg构件名称:KZ5构件位置:[3,0.2/D]、[4,0.2/D]、[5,0.2/D]、[6,0.2/D]、[7,0.2/D]柱(KZ5)纵筋:4B22/6B18/6B18本标准层有:1个自然层。标高为:7.15米至11.65米(1B22)长=1.5*31*0.022[锚固长]+0.6[非搭区]=1.623(1B22)重=1.623*2.984054[钢筋比重]=4.843(伸到下层柱按1.5*Lae锚固)(3B18)长=1.5*31*0.018[锚固长]+0.6[非搭区]=1.437(3B18)重=3*1.437*1.99759[钢筋比重]=8.612(伸到下层柱按1.5*Lae锚固)(4B22)长=4.5[柱高]=4.5(4B22)重=4*4.5*2.984054[钢筋比重]=53.713(2层)(12B18)长=4.5[柱高]=4.5(12B18)重=12*4.5*1.99759[钢筋比重]=107.87(2层)箍筋(A8@100/200)的计算:加密区箍数n1=(0.6[底加密]+0.6[顶加密]+1.25[梁高])/0.1[间距]+2=27(四舍五入)非加密区箍数=(4.5[柱高]-(27-1)*0.1[加密长])/0.2[间距]-1=9(四舍五入)箍筋(A8@100/200)长=(540+540+540+540+4*2*8+2*11.9*8)/1000=2.4144箍筋(A8@100/200)重=36*2.414*0.3935856[钢筋比重]=34.204箍筋(A8@100/200)长=(129.5+540+129.5+540+2*18+4*2*8+2*11.9*8)/1000=1.6294箍筋(A8@100/200)重=72*1.629*0.3935856[钢筋比重]=46.163拉筋(A8@100/200)长=(540+2*8+2*11.9*8)/1000=0.7464拉筋(A8@100/200)重=144*0.746*0.3935856[钢筋比重]=42.281电渣压力焊(直径22)20(个)电渣压力焊(直径18)60(个)柱圆钢筋d<=10---合计柱螺纹钢d<=20---合计柱螺纹钢d>20---合计