钢筋工程量计算书工程名称:厂房算量钢筋简图6.bmp8.bmp11.bmp13.bmp15.bmp21.bmp23.bmp25.bmp27.bmp钢筋工程量计算书厂房算量计算表达式件3122.9313245.8623215.643204.363200.565313.2273270.2043192.9843183.489659.904989.358重量kg构件名称:KZ7构件位置:[6,B]、[7,B]、[8,B]插筋(4B22)长=6.85/3[非搭区]+1[伸入长]+0.15[弯折]=3.433插筋(4B22)重=4*3.433*2.984054[钢筋比重]=40.977插筋(8B22)长=6.85/3[非搭区]+1[伸入长]+0.15[弯折]=3.433插筋(8B22)重=8*3.433*2.984054[钢筋比重]=81.954柱(KZ7)纵筋:4B22/4B22/4B22本标准层有:1个自然层。标高为:-0.5米至7.15米(4B22)长=7.65[柱高]-6.85/3[本层非搭区]+0.65[上层非搭区]-0.8[梁高]+0.806[斜长]=6.022(4B22)重=4*6.022*2.984054[钢筋比重]=71.88(第1层层,斜弯后伸入上层)(4B22)长=7.65[柱高]-6.85/3[非搭区]+0.17[差c]+0.2-0.03[保护层]=5.707(4B22)重=4*5.707*2.984054[钢筋比重]=68.12(1层:柱顶锚固)(4B22)长=7.65[柱高]-6.85/3[非搭区]+12*0.022[锚固]-0.03[保护层]=5.601(4B22)重=4*5.601*2.984054[钢筋比重]=66.855(1层:柱顶锚固)箍筋(A8@100/200)的计算:加密区箍数n1=(6.85/3[底加密]+1.142[顶加密]+0.8[梁高])/0.1[间距]+2=44(四舍五入)非加密区箍数=(7.65[柱高]-(44-1)*0.1[加密长])/0.2[间距]-1=16(四舍五入)基础内的箍筋数=3基础内的矩形箍长=(840+940+840+940+4*2*8+2*6.9*8)/1000=3.734基础内箍筋重=3*3.734*0.3935856[钢筋比重]=4.409箍筋(A8@100/200)长=(840+940+840+940+4*2*8+2*11.9*8)/1000=3.8144箍筋(A8@100/200)重=60*3.814*0.3935856[钢筋比重]=90.068箍筋(A8@100/200)长=(272.7+940+272.7+940+2*22+4*2*8+2*11.9*8)/1000=2.7237箍筋(A8@100/200)重=60*2.724*0.3935856[钢筋比重]=64.328箍筋(A8@100/200)长=(306+840+306+840+2*22+4*2*8+2*11.9*8)/1000=2.5904箍筋(A8@100/200)重=60*2.59*0.3935856[钢筋比重]=61.163电渣压力焊(直径22)36(个)柱圆钢筋d<=10---合计柱螺纹钢d>20---合计