49材料与技术Material&Technology2023NO.06收稿日期:2021-11-22作者简介:何佳(1986—),男,宁夏中卫人,硕士,高级工程师,主要从事房屋建筑及桥梁检测方面工作,邮箱:510353528@qq.com。ErrorAnalysisofAlignmentControlforMainArchesofaLong-spanConcrete-filledSteelTubeArchBridgeHeJia,RanDuobing,ShiYalan,LiuCaipengAbstract:Thelong-spanconcrete-filledsteeltubearchbridgeisaself-builtarchitecture,thestiffnessofsuchstructureisgraduallyformedalongwiththeproceedingofconstruction,andthealignmentcontrolofarchribsisthekeytoachievingthegoalofbridgedesign.Inthearchribhoistingprocessofasuperlong-spanconcrete-filledsteeltubearchbridgewiththecable-stayedsuspensionmethod,thealignmentofmainarchesisaffectednotonlybytraditionalfactorslikeerrorsincableforceandtemperature,butalsobysomepotentialerrorsindeadload,positioning,buckletowerdeviation,andsoon.BasedonthehoistingofarchribsofHejiangYangtzeRiverBridge,thispaperanalyticallycalculatedthepossibleimpactofcableforceerrorsandtheabovepotentialerrorsonthemainarchalignment,soastoprovidereferenceforthealignmentcontrolofthemainarchofsuchsuperlong-spanconcrete-filledsteeltubearchbridges.Keywords:concrete-filledsteeltube;alignmentcontrol;cable-stayedsuspensionmethod;erroranalysis0引言钢管混凝土是一种组合结构,不但能够充分发挥钢材及混凝土的材料特性,格构曲桁梁结构的主拱也增强了桥梁结构的整体稳定性,而且逐渐组合形成的劲性骨架也能够承受施工荷载,便于后续构件的吊装和安装[1]。钢管拱桥施工过程中,先通过斜拉扣挂法或转体施工法形成空钢管体系,然后在管内灌注混凝土、安装桥面系并浇筑桥面铺装层,最终形成钢管混凝土拱桥。由此产生的结果就是,各节段的内力和位移随着构件数量的增加而不断变化。因此,施工过程中,对主拱圈进行有效的施工控制是合理成桥状态的保证。超大跨径钢管混凝土拱桥施工控制过程中,主拱线形控制是重中之重,引起线形误差的因素除了索力误差、温度误差之外,还有其他一些潜在因素容易被忽视,如自重误差、定位误差、扣塔偏位误差等[2]。本文以合江长江一桥为依托,对索力误差及以上潜在因素可能引起的主拱线形误差进行研究。1工程概况合江长江一桥跨径布置为10×20m+530m+4×20m,净跨...